Heat and Power Plant with an Absorption Chiller 850 kW















































If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.
Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.
Do not buy products which price is too different from the average price for similar equipment.
Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.
The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.
- Transfer of prepayment to the card
- Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
- Transfer to the “Trustee” account
- Such a request should be alarming, most likely you are communicating with a fraudster.
- Transfer to a company account with a similar name
- Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
- Substitution of own details in the invoice of a real company
- Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.
Seller's contacts


Marke: Heat and Power Plant with an Absorption Chiller
Heat and Power Plant with an Absorption Chiller
An 850 kW combined heat and power plant with an absorption chiller
The systems ran perfectly until the end and all maintenance was carried out
No damage is known
The CHP ran for 51,429 hours of operation
The absorption chiller has run for 42,350 hours
The following components use an overhauled long block* or completely overhauled. The components relevant to assemblies for "modernization" were marked
complete panelling*
Interfaceschronk*
Oil relubrication pump
Mechanically overhauled and electrically tested
Oil level monitoring
Plotter heat exchanger"
Pressure expansion foll3 (if present) *
Pressure transducer and temperature sensors *
Rubber rails for motor and generator*
Clutch element *
Air filter inserts *
Safety valves and arnot inserts *
Sylomer strips *
Hot water preheating pump and heating element *
Test run with performance and efficiency measurement *
Loosening *
Updated spare parts list and new circuit diagram *
Optional
Generator (suitable for grid code) *
Exhaust gas heat exchanger *
Gas pressure control line"
Integration new I pipework
module frame )*
Dia.ne XT3 module controller *
Complete documentation (maintenance log
descriptions
techn
technical diagram
unit drawing ) *
Not included
Seals and connection parts on site
Motor type
JMC 316 GS-N.LC
Electrical output per unit: 835 kW
Thermal output per unit: 986 kW
Frequency: 50 Hz
Voltage: 400 V
Emissions according to valid TA Luft: NOx 500 mg/Nm 3
co 300 mg/Nm 3
The system is operated with natural gas in accordance with the technical instructions TA 1000-0300
electrical output 850 kW el
thermal output 945 kW Emission values
NOx < 500 mg/Nm3 (5% 02)
CO < 300 mg/Nm3 (5% 02)
Find more here
show contacts
Contact us at
show contacts